One mission. Total facility intelligence.
Thermal diagnostics, structural assessment, and security evaluation in a single engagement. You receive a prioritized recommendations report — not raw data. Clear findings. Clear next steps.
- SCOPE
- Full-facility exterior — thermal, structural, security
- SENSORS
- Radiometric thermal + high-resolution visual
- COVERAGE
- 100% rooftop, single mission day
- TIMELINE
- Report targeted within 48 hours of capture
- DELIVERABLE
- Severity-ranked Facility Intelligence Report (PDF)
- CLASSIFICATION
- NFPA 70B-aligned severity ranking
- ENGAGEMENT
- One-time, two to three weeks end-to-end
- AREA SERVED
- Mid-Atlantic United States
- 0.5°C
- Radiometric thermal sensitivity — early-stage degradation detected before operational impact
- 100%
- Rooftop coverage per mission — no scaffolding, no personnel on the membrane, no operational disruption
- 1DAY
- On-site capture — thermal and high-resolution visual data across every structure, typically in a single day
- 73%
- Of cooling system failures show detectable thermal signatures weeks before catastrophic failure
ASHRAE / Uptime Institute
What you receive.
Executive Summary
Facility health score, total findings by severity, and recommended priority actions for leadership review.
Geolocated Findings
Each finding mapped to a specific rooftop coordinate, with ΔT measurements, equipment ID, and severity rating.
Structural Assessment
Membrane condition ratings, area measurements, degradation velocity, and projected repair cost for every roof section.
Compliance Package
NFPA 70B alignment, ASHRAE temperature verification, inspection certificates, and a full verification trail for every data point.
How the engagement runs.
- 01 · T+0
Scoping Call
We learn your facility, your priorities, and your pain points — a real conversation about what matters to your operations team.
- 02 · WK 1
Flight Planning
Airspace authorization, safety planning, and mission design tailored to your site geometry and inspection requirements.
- 03 · DAY 1
Data Capture
On-site aerial operations. Thermal and high-resolution visual data across every structure — typically completed in a single day.
- 04 · HR 24
AI Analysis
Our analytics pipeline processes thousands of data points: anomaly detection, severity classification, and automated damage assessment.
- 05 · HR 48
Report Delivered
The Facility Intelligence Report: severity-ranked findings, remediation priorities, cost estimates, and suggested timelines.
- 06 · WK 2-3
Review & Handoff
We walk your team through every finding. Questions answered, priorities confirmed, and a clear path forward.
Scan or standing watch.
Most engagements begin with a Scan; Deployments extend it into persistent coverage.
| INTELLIGENCE SCAN · THIS PAGE | AUTONOMOUS DEPLOYMENT | |
|---|---|---|
| CADENCE | One mission | Up to 200 missions / month |
| RESPONSE | Scheduled window | Alarm to airborne < 90 s target |
| DELIVERABLE | Severity-ranked report, 48 hr target | Live feeds + trend reports |
| BASELINE | Point-in-time state | Degradation velocity over time |
| COMMITMENT | About two–three weeks end-to-end | Standing engagement |
The other mode: Autonomous Deployment →
Start small. Scale on evidence.
No engagement asks for trust we haven't earned yet — each rung produces the proof the next one stands on. The first scan is your baseline; the program turns it into a condition-of-record that tracks degradation velocity over time.
One mission at the founding rate. Full facility pass, severity-ranked report on a 48-hour target. Zero integration required.
Persistent coverage on one site for one quarter — baselines, alert verification, and the trend line that makes the case.
Standing coverage with degradation-velocity tracking and founder-direct reporting, priced on scope.
Signed Monday, flying Friday.
From signed engagement to delivered report, typically inside fifteen business days.
Asked before engaging.
How fast do we get the report?
Severity-ranked findings are targeted within 48 hours of the mission — about two business days from capture to prioritized report.
How long does the full engagement take?
Two to three weeks end-to-end. From signed engagement to delivered report, typically inside fifteen business days, with on-site capture usually completed in a single day.
What do we actually receive?
One PDF engineered for your next maintenance window — not a file dump of raw imagery. It includes an executive summary, geolocated findings with ΔT measurements and severity ratings, a structural assessment, and a compliance package.
Will the scan disrupt our operations?
No. A single aerial mission covers 100% of the rooftop with no scaffolding, no personnel on the membrane, and no operational disruption.
How are findings classified?
Severity classification is aligned to NFPA 70B, so reports map directly to the electrical maintenance standard your team already uses, with ASHRAE temperature verification included.
Can we see a sample report first?
Yes. Request the sample report PDF — no sales call required.
Request a Q3 assessment
Two fields. A one-business-day response target. A mutual NDA before we see your site.
- Mutual NDA by default
- $5M liability coverage per operation
- Your data stays in your control
REQUEST FILED
- REF
- FILED
- SCOPE
- FACILITY ASSESSMENT
- NEXT
- FOUNDER RESPONSE TARGET < 1 BUSINESS DAY
Filed directly with Adnan Abdillahi, founder. Keep the reference for your reply.